Projects

Hospitality, Timeshare/Resort and Residential Projects

San Clemente Inn (San Clemente, CA)

Caliber Contracting Company Inc. completed a renovation of San Clemente Inn's lobby restrooms, business center, and room interiors. Current San Clemente Inn projects Caliber Contracting Inc. is in the process of completing is a renovation of the lobby, front desk, recreation room, executive office and a 1.5 million dollar exterior landscape renovation. In addition, Caliber completed a 1.5 million dollar stabilization project for two of five buildings at the resort.

Four Seasons Pacifica (San Clemente, CA)

Caliber Contracting Company Inc. completed a four phase renovation at the Four Seasons Pacifica in San Clemente, CA. Phases of construction included the renovation of all living rooms, bedrooms, kitchens, and bathrooms.

Winner's Circle Resort (Del Mar, CA)

Caliber Contracting Company Inc. completed a renovation of Winner's Circle Resort's room interiors and resort hallways.

Capistrano Surfside Inn (Capistrano Beach, CA)

Caliber Contracting Company Inc. completed a renovation of room bathrooms, hallways, and performed work on the resort's elevator.

Desert Isle Resort (Indian Wells, CA)

Caliber Contracting Company Inc. completed a renovation of the lobby, front desk, executive offices, and is in the process of completing a exterior landscape renovation.
Commercial/Retail Projects

EL Polo Loco – La Mesa, CA

El Pollo Loco - La Mesa, San Diego
Tenant Improvement/conversion from existing “La Salsa” restaurant to a new “El Pollo Loco”. Complete interior remodel with site improvements.

Swarovski – San Francisco, CA

Swarovski Store # 265, San Francisco, CA
Mall space - interior T.I. (Tenant Improvement) with implementation of new display fixture concept.
Swarovski interior - General Contractor in San Clemente, CA

Beach Bunny Swimwear

1. Robertson Blvd, Los Angeles
2. Scottsdale Quarter Mall, Arizona

Beach Bunny Swimwear – 2 locations
Beach Bunny – 136 S. Robertson, Los Angeles
In-line store T.I. New display, flooring, light fixtures and window displays
Beach Bunny Store - General Contractor in San Clemente, CA
Inline Store - General Contractor in San Clemente, CA
Beach Bunny - Scottsdale Quarter, 15147 N. Scottsdale # H
Complete buildout in new ground-up mall.

99 Cents Only Stores – Tustin, Glendora and Yucca Valley

99 Cents Only Stores – three locations

99 Cents Only Store – 14551 Redhill Ave., Tustin CA.
Former Ralphs market (and subsequent Woori Market), converted into new 99 Cents Only Store. Complete interior remodel and build-out with select site and parking lot improvements. New electrical service for entire shopping center. New sewer system.
99 Cents Only Store – 1788 Barranca Ave., Glendora CA.
Former Rite Aid Pharmacy converted to new 99 Cents Only Store. Complete interior build-out with site work. New loading dock and parking lot/planter reconfigure.
99 Cents Only Stores Yucca Valley – 57890 Twenty Nine Palms Highway, Yucca Valley CA.
Demise former Walmart location into multiple tenant suites. Perform complete build-out with site improvements. Add new truck dock, parking lot reconfigure. Install new electrical service to entire shopping center. Reconfigure septic system.

SCUHS

Southern California University of Health Sciences campus (SCUHS). 16200 Amber Valley Blvd. Whittier CA.
Development of approx. 5 acre site. Demolish existing sports court complex, expand existing parking lots, install storm water retention basins, electric vehicle charging stations, Code Blue emergency call stations, new landscaping planters, widen roadways and install new drive approaches and retaining wall system.

Multi-family Residential

Coronado triplex, Coronado Island, San Diego, CA.
Complete demolition of existing structure and ground-up construction of a new three unit dwelling.
Front of Unit 1&2 - General Contractor in San Clemente, CA
Construction - General Contractor in San Clemente, CA
Unit 1 - General Contractor in San Clemente, CA
Unit 2 - General Contractor in San Clemente, CA

Commercial Projects

Oak Creek Village Center (former Indy Mac Bank building and site). 5501 5797 Alton Pkwy, Irvine, CA
Site prep, grading and implementation of a certified pad. Included site improvements, utility upgrades and parking lot reconfiguration for the construction of an approx. 5000 s.f. ground-up building. Constructed while the rest of the center remained open. Parking and traffic flow had to be maintained and business access to the rest of the center’s tenants had to be uninterrupted.
Oak Creek Village Center - General Contractor in San Clemente, CA

Timeshare/Resort

Grand Pacific Palisades Resort – 5805 Armada Drive, Carlsbad, CA.
Dry-rot replacement of exterior timber trellis structures across resort property.
Oak Creek Village Center - General Contractor in San Clemente, CA
Entrance of building - General Contractor in San Clemente, CA
Side view of building - General Contractor in San Clemente, CA
Building - General Contractor in San Clemente, CA
Share by: